Project: FloMoSlingTSi   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1130
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Sep 06, 2023     Fuel Lines - (2.5 hours)       Category: Fuselage
Covered the fuel braid with some PVC for extra abrasion protection and ran the lines to the center channel. Leaving the adel clamp tightening until the wings are installed as the fuel lines run very close to the spar wing attach bolt holes. Once wings are on will just do some fine tuning of lines and tighten clamps.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.